GOLD RECOVERY FROM EWASTE Delmer Group
GOLD RECOVERY FROM EWASTE Delmer Group
GOLD RECOVERY FROM EWASTE Delmer Group
GOLD RECOVERY FROM EWASTE Delmer Group

GOLD RECOVERY FROM EWASTE

Regular price ₹2,500,000.00 Save Liquid error (snippets/product-template line 116): Computation results in '-Infinity'%
12 in stock

Nowadays, waste causes a lot of pollution that can be harmful. But at Delmer, we turn e-waste into useful products.

We recycle e-waste and manufacture mining machines that help you mine gold. They are made with super high quality at a lower price that fits everyone's pocket.


The increase in global Technological Development has led to a dramatic increase in the generation of e-waste, creating challenges and opportunities in its recycling.

In this review, we focus on the basic value of metal resources in printed circuit boards commonly found in end-of-life electronic devices, and the difference between primary and secondary mining applications.

secondary as well as the diversity of metallurgical industries, particularly those with the potential for selective and sustainable gold recovery from PCB waste.

This is a very reliable and durable method that can be very useful for e-waste and can produce a useful product.

At Delmer, we offer products that can reduce pollution and benefit our customers. "BENEFITS OF RECYCLING TECHNOLOGY WASTE". According to research and practice, extracting minerals from natural deposits is 13 times more expensive than recovering them from technological waste to produce New equipment. Obtaining minerals like platinum, copper and palladium is not only about digging up and processing them, but also about using large amounts of water and energy to extract resources."

  • No aqua regia.
  • No cyanide.
  • No corrosive/toxic gas/vapor. a gold alloy with a gold content of at least 55% is refined in a single step to produce pure gold with a purity of 99.99%.
  • Processing time 6 to 8 hours.
  • No need for gold in the electrolyte.
  • No acid waste to handle.
  • Low operating costs because the electrolyte is reused.
  • Fully automatic process with process control.
  • Patented process

Technical Data :

Delmer IQ 1 Delmer IQ 2 Delmer IQ 5
Quantity in 6-8 hrs 1 kg 2 kg 5 kg
Power supply 400 V 400 V 400 V
Power 0.5 kW 0.8 kW 2 kW
Dimensions (mm) 120 x 60 x 175 140 x 60 x 175 180 x 60 x 175
Weight 100 kg 130 kg 180 kg